Survey Would Include
Total floors and Area per floor in square meters:
- Specific priority areas identified
- Signal level inside/outside db
- Construction material of internal partition walls and exterior walls
- Ceiling type (plaster or suspended ceiling) to be identified
- Roof access to run cabling from external aerials to repeaters
- Riser access between floors
- Ensure adequate space above ceiling to run cables and mount directional couplers and splitters
- Identify any issues with building layout or construction that would impede cable runs or signal spread.
- Identify any remedial work required prior to and after the installation.
- Travel and miscellaneous expenses
- System configuration layout drawing and connection diagram.
|
The process:
-
Send in plans of the buildings to
sales@mobilesignalsolutions.com
FAO Installation Engineers
-
Project manager will send a estimate of costs and bill of materials
-
Survey of the buildings
-
Full report and schematic
-
Installation and guaranteed results
|